Is this email not displaying correctly? View it in your browser.
About Us Products Parts Service Rental Technical Data

Save the Date! BCEW Open House



BCEW looks forward to showing you our gratitude at our Customer Appreciation Open House at our Poway, CA Corporate Headquarters.

Friday, November 14th
11:00AM - 4:00PM
RSVP at: http://eepurl.com/1LwLb
Email: alee@bcew.com

Bay City Electric Works
13625 Danielson Street
Poway, CA 92064
(866) 938-8200
Map Quest

BCEW Supplies Generator to Homes for Our Troops


Bay City Electric Works were honored to work with Homes for Our Troops and supply a generator for Sgt Julian Torres' new home.

HFOT is a privately funded organization building specially adapted, mortgage-free homes nationwide for the most severely injured Veterans from Iraq and Afghanistan.

Read More

Kohler Power Systems is Sponsoring a Free Webinar


Kohler Power Systems is sponsoring a webinar through ES Engineered Systems entitled “Test Anxiety? Learn How and When to Test Your Standby Generator”.

Standby generators are the heart of a backup power system. Regular testing of these complex pieces of equipment to assure reliable operation when needed is both recommended by manufacturers and mandated by codes. Facility operators must know how to effectively test their systems and where to look for the causes when problems occur. This webinar will discuss generator reliability, testing, and troubleshooting from a practical perspective and make recommendations for a comprehensive inspection and testing program.

When:
Thursday September 25th at 8:00 am PT.

Register for this Event

BCEW Supplies Generator in Largest US Desalination Plant


Bay City Electric Works recently supplied a 200kW generator at the largest seawater desalination plant in the Western Hemisphere, which is currently being constructed in Carlsbad to provide San Diego County with one-third of its water, could be operational three months ahead of schedule, according to a report in the San Diego Daily Tribune.

The plant, which is being developed by Poseidon Water and is expected to produce 50 million gallons of drinking water per day, was originally expected to be operational in November next year.

Read More

Maintenance of a Generator Set System Batteries

Maintenance of a generator set’s starter battery is critical to ensuring sufficient ampere capacity to start the engine. As a precaution generator users routinely change out the batteries every 2 years.

Learn More

Kohler Power Systems RESV Product Line - 8, 10 and 12kW

Three new KOHLER® generator models offer quiet, reliable performance in compact footprints that fit comfortably on smaller lots.

Learn More

Nationwide Service Capabilities

Visit NASS at: www.northamericansite.com for all of your power systems service and rental needs throughout North America.

Copyright © 2014
BAY CITY ELECTRIC WORKS
All rights reserved.


Corporate Facility
13625 Danielson Street
Poway, CA 92064

Toll Free: 866.938.8200 
Fax: 619.938.8202 




Inland Empire
766 Gifford Avenue
San Bernardino, CA 92408

Phone: 866.938.8200 
Fax: 909.890.9258 




Bay Area
322 Lindbergh Avenue
Livermore, CA 94551

Phone: 866.938.8200 
 
Fax: 909.890.9258